Project Engineering
Fromg
David L. Narver, dr,
Jobs
Jeg 834
4
:
PROSECT ENGINCERING FILE
88h,
Res
Bldg. lill = Assembly
Bldg. - Elmer
Dates
ACTION:
oar
ATORHC ENGREY Corgitissiony
ELMER CENERS SE
FOLDER
ae
be
BOX No £29624 (#EOR) Alb 334 326.68 vo" 70
a7=53
Tos
(7
April 7, 1953
Re Ae Williamson
Reference file memorandum #1666 dated March 26, 1953.
|
%
3B
User requirements for access were
a
os fe
‘s outlined on the sketch(AEC-18)
mentioned in the reference memorandum,
However, specification of
actual door sizes was reserved to Holmes & Narver,
in case a
reasonably larger size would better serve future uses of the
neo 08 building.
OO EOS
'z25228| Mro So P. Howell, after studying the door size nsaeded if the buiiding
ESO esa is to be used for repair of cranes and other heavy-duty equipment
teas ona for which a 25-ton crane would be useful, has suggested increasing
#4529355) the size of the main doors in each end,
‘micpo OY
5 eyed a hp
1,-feet wide by 17-feet high.
These doors should be
David L. Nerver,
:
28 a
ces
Paul W.
Spain,
Chief Project Engineer
AEC
Robert H. Gampbell, J-Div., LASL
GC. Mo Bacigalupi, UCRL
Constre-Oper. Div. (2)
we on!
Ho Jo Tumidajewics
Co
Le
Bast
Bo
We Hom
Project Manager JS
Co De Grommon
Ro
Ao Williamsgn.....-:
Fo Ao Blackburpe —
Be EK. Sharp
Be
Jo Morris
‘
ve
Pye ies
.
ari the cits
and Fue!
-
°
mannertecn ye 3
te
te
ea
aay
cla pbb eee wy iaw."'