, Effects on Aircraft and on aircraft comatomic explosions on‘aircraft inflight gust and te mperature effects of the ure, press with d erne conc was ram The primary mission of this prog program. blasts were carried on under this operations in conjunction with the air to ing relat cts proje d alize several speci ponents on the ground. In addition, over ten ial Command and accounting for al aircraft conducted by Air Mater iment exper of on icati modif and the operation The major costs of this program were one anda drone activities accounted in excess of million dollars. The Air Proving Ground six ial, mater and ies suppl and rs; dolla million dollors; labor, four million am. Supplies and the balance of the cost for this progr and supplies half million dollars for personnel costs materials made up and materials. Other equipment and materials and supplies did not in operation. The installation of these nded expe as ted repor were and on aircraft during modificati material were installed in the test drone control equipment, such items as special radio equipment, capital equipment. This included as ted repor be d shoul ally logic necessarily destroy their yalue and g the.operation, three T-33's totaling experimental type aircraft were lost durin Six es. devic ng testi und al iment other exper recording meters, directional and many operation, $78, 000. $387,000 and three L-13's totaling 8.1. Test of Aircraft Airbome s 8.2 Static Tests of Aircraft Panel 8.3 Radar Scope Photography credited to the cost of the nted to $19,500, which amount was The salvage of the three L-13's amou CHART OF ACCOUNTS 8.7. Air Proving Ground Unit Training eres TPO aT or Te reer eye 8.99 Common to Program e