——

‘ eu .
wen

a

portray the costs ofa large scale joint operation of this specialized type.
This cost report of Operation GREENHOUSEis compiled and presented in an effort to
reflect to a
System used and the results obtained may not be all inclusive, but will
As this is the first effort to portray costs of a joint operation, the Cost

be used as a base of reference in the financial planning for subsequent operations.
mark ed degree a conception of the dotlars involved in the operation and may
which enabled the Task Force to operate with a minimum of cost
Existing systems and procedures of the participating agencies were utilized to the fullest,
manpower.
participating agencies has made possible the compilation of this report.
The cooperation of the Army, Navy, Air Force, Atomic Energy Commission and other

ER CG)econ
-E. R. QUESADA

Lieutenant General, United States Air Force
Commander

DEPARTMENT OF ENERGY DECLASSIFICATION REVIEW
ED BY: DETERMINATICN [CIRCLE NUIMDER(S)]

LoGholus kt 7?
.
°

REVIEWER

NAME:
DATE:

D}:

<%=

2

“A
S9f 4

TULA The ERS

Nd See

TO%
7 CLASSIEIA TION CHGNGED
SCONTAINS BC OOF LASSIFIED INFO

COORDINATE WAT:
CRECASSIFICATION CANCELLEDD = Pars Fre
A CUASSIFIED INFO BRACKETE

di

7. OTHER (SPECIFY)? ee

SEGRET..

OS

\

Select target paragraph3