—— ‘ eu . wen a portray the costs ofa large scale joint operation of this specialized type. This cost report of Operation GREENHOUSEis compiled and presented in an effort to reflect to a System used and the results obtained may not be all inclusive, but will As this is the first effort to portray costs of a joint operation, the Cost be used as a base of reference in the financial planning for subsequent operations. mark ed degree a conception of the dotlars involved in the operation and may which enabled the Task Force to operate with a minimum of cost Existing systems and procedures of the participating agencies were utilized to the fullest, manpower. participating agencies has made possible the compilation of this report. The cooperation of the Army, Navy, Air Force, Atomic Energy Commission and other ER CG)econ -E. R. QUESADA Lieutenant General, United States Air Force Commander DEPARTMENT OF ENERGY DECLASSIFICATION REVIEW ED BY: DETERMINATICN [CIRCLE NUIMDER(S)] LoGholus kt 7? . ° REVIEWER NAME: DATE: D}: <%= 2 “A S9f 4 TULA The ERS Nd See TO% 7 CLASSIEIA TION CHGNGED SCONTAINS BC OOF LASSIFIED INFO COORDINATE WAT: CRECASSIFICATION CANCELLEDD = Pars Fre A CUASSIFIED INFO BRACKETE di 7. OTHER (SPECIFY)? ee SEGRET.. OS \