SX]
1}
NSPXS
x
¥ mallu N
S
XQ XQ tS
OM ok aK
»
2
o
a
4
m2
X
5on 82
Also
Present
senentecrneennenenoeneasnioned
uy
oe
2
xK
Oo
oc
oO
Oo
Lewis L, Strauss
Henry 2D, Smyth
R.W, Cook
Carroll A, Towne
Eugene M, Zuckert
Joseph Campbell
A, Tammaro
E.R. Trapnell
Comdr,. James M, Dunford
a
&
6
oS
Oo
wu
L. R, Hafstad
K. D. Nichols
George F. Trowbridge
William Mitchell
Morse Salisbury
David S. Teeple
Roy B. Snapp
J. A. Waters
W.B. McCool
l,
wn
SSB
8:30 a.m., Thursday, March 11, 1954
Thoma: E, Murray
ite
)
S| NI.
at NISN
NX
,
Present
SK YSS
Ni
MEE TING NO, 966
.
Cs
ATOMIC ENERGY COMMISSION
SQ — G
R
Ervin, JHAUIES
408430
AEC 294/66 .. MTA Project
Under consideration was a recommendation by the General Manager
vroposing a reduction in the level of effort on the MTA Project and the
transfer of the contract from the California Research and Development
Company to the University of California, Mr, Nichols said that Dr. E, O.
Lawrence had been consulted regarding the change and would continue wit.
the A-54 experiment,
BEST COPY AVAILABLE
After discussion, the Commission:
a, Concurred in the determination that construction of
a large-scale production accelerator should not, on the basis
of presently known facts, be undertaken in the near future,
- 85 «
wnt
Ve ENON a
[srkeviy
HAN|eefie
AUTHOR ge
F148
I, AME: Du
8
SEASS
I
‘MoTeahe ety FC:
OUNTAINS UOT CLA SHILOTIATOO
i 2ND REVIEW AdeOE
bac oOOORDINALE WITH:
Li ASSIFICATION CANCELLED
[raantes Ld ARN
NAME: ec 0 CLASSIFIED
INFO RGACKETED