8ae
.

|

Soe

eee

vee ee ee

wt

ae eee

f

’

[
:

.

:

APPENDIXA TASKUNIT7 .
Bi Afloat

i

B.2

:

“-

t

:

weg,

.
.
.
.
.
.
.

.
.
.
.
.
.
.

88
68
68
69
&9§
69
69

STANDARD OPERATING PROCEDURE FOR RADIOLOGICALSAFETY CONTROL GROUP.
.
.
.
.
°
.

.

-

10

.

.

.

.

.

.

.

.

.

.
°
.
.
.
.
.

.
.
.
.

.
.
.
°

.
.
.
.

+
-

0
%0
%0
70

.
.
.
e
.
.

.
°
.
.
.
.

.
.
.
.
.
.

.
-

71
Tt
TW
71
72
12

.

.

-

72

«©

«

.
7

.
:
8

.

.

o
.

.

«©

«©

.
«

- 7
«©

.

.

.

8

.

.

.

4

.

4

«

Recovery Survey .

C.13.5

Records and Reporting

C.14.1

General

.

.

C.14.3

Flight Pian and Location of Position with Respect toGround

9.

2.

6

6

:

.

.

Personnel and Equipment

.

.

e

e

.

.

.

.

C.14.4 Procedure for Taking Readings
C.14.5 Correction to Ground Intensity

C.14.6 Data ToBeSenttoRIC

C.14.7

.

.

.

.
.

.

.
.

.
°

.
.

4

os

.

.

C.15.1 Afloat.
=.
C.15.2 Parry-based Operations

8
.
.

.
.

.

©
.
.

.
.

e
.

.
.

ele
.
-

.

C4
74

-

2

.
.

-

75
75

.

76

-

14

75

. 16

8

eee

8B

.

.

.

Pa
a
see
ell
.

.

.

.

.

.

RE reee

ye

Messages

« 7

ell

Maximum Radiation Levels and Accumulated Doses (Initial Survey)

C.15 Communications
C.15.3

ew

fe

.

.
-

C.13.3

zi
,.

Fi
nn

.
.
.
.
.
.
.

Purpose .
.
.
.
.
.
.
.
.
.
Command.
.
.
Duties of Control Group Officer Prior to Daily Operations
Duties of Control Group Officer During Daily Operations .
Duties of Rad-Safe Duty Officer
.
.
.
.
Duties of Senior Monitors Prior to Trip .
.
.
.
Duties of Senior Monitors During an Operation .
.
°
Duties of Senior Monitors After an Operation .
.
.
Allowable-radiation-level Guides
.
.
.
.
.
Control of Entry into Contaminated Areas
.
.
.
Schedule of Operations for Recovery Trip
.
.
.

C.14.2

2

.
.
.
.
.
‘
.

8B

.
.«
.
.
‘s

po

p

. 68

.
.
.
.
.
.
»

C.13.6 Protective Clothing
.
C.14 Standard Operating Procedure for Aerial Survey

:

.

eee
.
.
.
.
.
.
.

C.13.4 Reentry Surveys...

¥

i
—

see

C.13.2 Initial Recovery Survey

L

:

Page

«wwe

C.13 Standard Operating Procedure for Ground ‘Survey
C.13.1 Purpose andScope
.
.
«
«

.

.

C.1
C.2
C.3
C.4
C.5
C.6
C.7
C.8
C.8
C.10
C.11

.

C.12 Final Briefing Check List .

x
E

a

“

.

B.1.1 Instruments .
.
.
B.1.2
Dosimeters and Film Badges
B.1.3 Protective Clothing
.
.
On-shore Supply
.
.
.
.
B.2.1 Instruments .
.
.
B.2.2 Dosimeters and Film Badges
B.2.3 Clothing
.
.
.
.

APPENDIX C

«

°

.

APPENDIX B STANDARD OPERATING PROCEDURE FOR EQUIPMENT ISSUE
foo.
we pee me mE CWE eee

.

CONTENTS (Continued)
;

Be,

aCERE ween: near

ee ee

Fe en

er EE hnAA RRRNR ee crete cine entree ni eater memesare ae mk ete

5

Select target paragraph3