UNCLASSIFIED
@pTable L.1— (Continued)
No. of
‘
-
persons
Item
Time
, Project
(exclusive
of crew)
.
9
10
0730
0730
Aerial survey
Ground survey
2
2
1 helicopter
1 helicopter
ll
0800
Water survey
2
1 helivopter
0900
:
‘
,
"
transportation
Approx,
recovery
4,1, 4.2, 4.4,
§.1, 5.2, 8.1
3
2
1LCU,
2 DUKW’s,
a
4
1'4-ton truck,
2%/,-ton trucks,
and remarks
13
=—s-0900—ts«6=.8
2
14
0900s
6.2
3
15
0900
§.4b
16
1600
Water survey
with A frame
All islands
Y; other islands as
required
Lagoon
Y, Stations
412.01—4.2.24, 441,
§11.01-511.26,
§21.04—521.06,
1%%-ton truck
@
Destination
time, hr
K+i Day
12
:
Meansof
810.09—810.11
LCM
¥/-ton truck
a'4 . T, Station 630,04
LCM
24
Lagoon to recover
4
1 helicopter
8
A, 8, C, I, J, K, L,
2
1 helicopter
rafts
M, N, O, P, R, S,
T, U,V, W, ¥, Z,
BB, DD, EE, FF,
GG,JJ, KK,LL,
andMM
Lagoon
K + 2 Days
17
18
19
20
0780
0730
0800
0800
Aerial survey
Ground survey
Water survey
§.4b
2
2
2
1 helicopter
1 helicopter
1 helicopter
21
1600
Water survey
2
1 helicopter
£
‘
22
0800s
«5.3
2
1 helicopter
[.
Eeneet aor Ne MeeiN ere
ne tows
;
i
All islands
As required
Lagoon
Continues from
previous day
Lagoon
8
A, J, T, ¥, BB, LL,
After K + 2 Days
:
i
2
2
2
}
SNOLASSIFIED
103-104
wee ee ee
EE, and FF
PAL Wem EAMRTAT ERT sore etOPM orNCARALAMTG A to ae LAMASURO SAR,akAE SReeANatiEitetNTISRALIane IAAREAS 0BSIS
—
pe Cee ere ve,
IMOLASSIey
+
ele
OMAN OD
;
“SOT cercrenes.