Procedure

1,3.!

The installation does not require the services of a refrigeration
service man, Only plumbing connections are required. A 110-115 V,
60 cycle AC single phase receptacle is required for electric current.
Provide for

15 amp service,

To take off front access panel remove 7 screws on front,

Connect city water to connection "A" with a shut off valve and a

100 mesh strainer between this shut off valve and connection '"'A''"~
This is a $" female pipe connection; no smaller than 4 pipe should
be used,

Connect

12" drain pipe to connection ''B'' which is the main overflow

1.3.5

Plug in

line cord to

1,346

All other connections are made and tested at the factory.

1.3.73

See Dwg.

and drain assembly and carries al! waste from the tank and refrigerating
system; no smaller than Id'' pipe should be used.

T-!7-1

for

115V 60 cycle AC

15 amp service.

location of connections,

&