ieee
vt

“

Tor

osSECirea
=e

Yow

DELETED

Production of XW-25 warheads of stockpile quality is

scheduled to begin in the April-June quarter.

4, Retirement of the Cless A thermonuclear weapon (Mark 17)
began in January.
WEAPONS DESIGN AND DEVELOPMENT
New Development Programs
5. A feasibility study was completed and a development

program was established for the new Class 3 thermonuclear

weapvon (TX-41),

PELETED

Lek.

DELETEL

_ DOE ARCH
abyVino

6. A joint progrem with the Navy was euthorized for the
development of a laydown weapon

DELETED

using the Lulu

warhead (XU-34), 17 inches in diameter, weighing 330 pounds prLETED
pony

DELE Yul

7. A develovoment program was establisned for a modification
of the Class D thermonuclear bomb (TX-28), 20 inches in Giameter,
DELDTTID

LiLlTey
will be parachute

‘The modified veysion (®X-28-x1)

stabilized for low-level delivery and will

provide a capability of in-flignt selection for either free-fall

or drosue-parachute retardation,

Select target paragraph3