Tt mission other than minor changes dictated by expediency which can be handled better by the Party Chief(s). H&N/Ent and the DOE/PASO Site Representative, Enewetak will insure that the whole body trailer on Enewetak Is prepared and loaded aboard the M.V. Caroline Islands on or around March 22, 1978 (refer to msg. PASO to HiCom TTPI DTG 2418352 Feb 78), from Director, H&N/PTD will make all travel related arrangements per PASO SOP No. LV. SCHEDULE OF M.V. 5. CAROLINE ISLANDS 3/20 Ly Majuro 3/22 Arr Enewetak 3/22 Dep Enewetak 3/2 3- 24 | Arr Kwajalein 4/1 Lv Kwajalein 4/2 Arr Utirik 4/8 Arr Rongelap 4/14 Arr Bikini 4/16 Ly Bikini 4/17 Arr Kwajalein 4/20 iv Kwajalein 4/21 Arr Bikini 5/5 Arr Kwajalein 5/7 Ready for TTPI deployment Proyecto PASO is responsible for coordinating any changes.in the ‘nn sn. Operations Plan - Voyage FY 1978 #4