~
Tosti,
‘
7
r
~
BO SWhRG
ver
Senet
BySb.nterhy
~~ 9
ve
kei
Figure 52.
Operations:
Scrubbing Project 6.4 test aircraft, CASTLE.
Sets of panels of outdoor construction surfaces were
mounted on YAG-39 and ¥AG-40, which maneuvered through fallout patterns from Bikini shots, and on a stationary barge in the Enewetak
Lagoon to sample fallout from NECTAR.
significantly.
All surfaces were contaminated
Decontamination was performed at Parry, using such
procedures as high- and low-pressure hosing, scrubbing, and applica-
tion of washing compounds.
Shots:
BRAVO, ROMEO, UNION (Bikini); NECTAR (Enewetak).
Radiation Exposure Potential:
High for those on the YAGs and for the
personnel participating in decontamination procedures and experiments
at Parry.
Staffing:
Five were associated with this project, three civilians
(two from ACC, one from Corps of Engineers)
AFSWP and one from ACC).
and two military
Their exposures are given in Table 19.
posures for those involved from TG 7.3 are given in Table 59.
Project Report:
(one from
Reference 73.
196
Ex-
;