-

UNCLA>SSIHIED

SE
ee
~
i
Ry
eineia Santee theme
=
“
—
.
_*
‘ neat
eee
een
ITE! ad
Mn Seot
hat heeee “2 ee
ee * ee cele

Ploche = No contamination

.

Warm Springs - 0.13 roentgen
4

.

Currant - No contamination
Ely ~ 0.1 roentgen

U.S. Highway 93 - 1 to 1.5 roentgens
|

_
3.

Sevada Highway 38 - 2 to 5 roentgens

-

O/K, Climax, 65 ET, exploded at 1334 ft above terrain at
0415 PDT, 4 June 1953

ened

a.

_

.

Forecast

Shoot this bomb at anytime regardlass of the winds.

The

contamination on the ground would not exceed 15 mr/hr
at any point. Since the fireball will not touch the
ground, no contamination is forecast
b.

Shot delayed because of possible rain om Salt Lake City,

Utah.

It was feared that *ne rain may bring dow

ines als

measurable amcunts of radioactivity (several xur/br)
and thus precipitate an acute public relations problem.
@.

Verification

Macxcimim dose rate was 1] or/hr at 346 hours,
}

.

There

was no extensive fall-out, as forecast.

IV.

|

FORECASTS OF RADIOACTIVE FALL-OUT LOUWNWIND FROM MECATON YIELD BOMBS

A. Forecast of IVY (R) MIZE Fall-out
Practically no information exists of the actual Paliceut dewnwind in the Pacific Test Site. since it is difficult and very expensive

to determine the fall-out pattern over abody of—water utilizing buoys,

UNCLvvvir el

Select target paragraph3