Appendix

PROJECT SUMMARIES
Brief summaries of the specific activities of each Castle project are presented herein as a complement to
the more-general discussion of the test programs contained in Chapters 2 through 9. The shot participetion of the various projects is summarized in Table A.1.
A few of the final project reports were as vet unpubliahed at the time thia final summary report was
prepared. in general, the draft manuscripts of such reports were available and were consulted in order
to riake these project summarics as cumplete as possible. In any case, the published versions of the
final (WT) project reports should he referred to for complete, final information. The report ttle and
short title (WT mumber) are indicuted herein for each project; information on the availability of these reports maybe obtained from Headquarters, Armed Forces Special Weapons Project, Washington, D. C.
TABLE A.t

PROJECT SHOT PARTICIPATION

714
25a

SRY

Be

9.1

2.5b

Bei

18.2°

2.6a

;

18.9*

2.6b

18.4°

2.7

18.5%

2.78
project sponso
to the DOD. See Text.

LASL,

but partially supported by and of interest

105