; € C ot pa pep f f ‘ _ ShiiteSacertathreae,TION # Yields given are estimated only as of this date, Experimenters must instrument to accept a rather wide range yieldwise on the respective shots. Positions given are approximate, they should be obtained from J-6, If exact site locations are required (In submitting requirements in monthly status reports, when appropriate and except_as.otherwise-indicated, dates shduld,be expressed.in-terns.of shot days, such as Bf3, Y-2 etc.) B. «Assumptions: Eniwetok ftoll is the base of operations. 1. All cryogenic work will be done on Eniwetok (Parry). 2. <All dewar repair and maintenance work will be done on Eniwetok 3. Five of the six devices will be assembled on Eniwetok.(Parry 4, Machine shop, laboratory, photographic, warehouse and stockroom 5. Much preliminary assembly and testing of experimental equip~ ment will be done on kniwetok (Parry). 6, 7, 8, ° The following obtains: (Parry). and Eberiru), facilities will remain on Eniwetok (Parry and Eniwetok). Port of entry for aircraft and most shipping will remain on - Eniwetok, Radio links with Los Alamos and Oahu will remain on Eniwetok, Temporary working camps will be located on Rojoa (Eniwetok Atoll), and on Eninman and Nam (Bikini). Enyu, Aomoen and Bikini: will have small temporary camps to support project personnel necessary at those sites, C. Piring of the five shots at Bikini toll will probably be accomplished from the timing and firing station on Enyu Island (Nan), by a firing party of 6 or less, This station will also serve as the television and photo stations, and for intra-atoll communications, Six radio time Signals in addition to the wired signals will be furnished at Eniwetok and Bikini, Certain time signals will be repeated back from Bikini to Parry (Elmer) to allow correlation of operations with the Bikini shots. Firing of the shot at iniwetok ..toll will be accomplished from the control station on Parry (Elmer). D, pmo There will be no pre-shot personnel or matcrial evacuation of SETrt TON ues one, a \q