these were data on the functioning of Zippers and included:

X-unit pulse to a known rate of neutron production

(1) time from D

pe and (2) the duration of the neutron pulse at this or a

-

and the total number of neutrons produced.

higher rate

Eyy.

Coincidental with the Zipper

monitoring was a measurement of HE transit time, or time from X-unit pulse
to a known point in the period of the nuclear detonation. The Zipper measurements were made on 29 shots with one failure due to unknown causes.
was monitored on two shots using detectors supplied by
LASL. On two shots for UCRL, simultaneity measurements between the firings of two primaries were successfully made. On two shots data on pin
switch closures were telemetered and turned over to the interested people.
On a third shot, Quince, the raster oscilloscopes failed; therefore, no pin
switch information was obtained. The Zipper information was obtained from
517 oscilloscopes,
An experimental early alpha system was tried out on 15 LASL shots
with at least partial success. The interpretation of these data is not yet
complete. The system operates by telemetry of two narrow pulses corresponding to two known gamma levels or generations. The time between the
pulses divided by the delta is an average alpha for that period. The making
of these measurements and interpretation of the data was complicated con-

siderably by their transmission over channels already crowded with other
ata.

&

“-Ehe responsibility of Project 34.2 was to apply the device fuze and fire device in support of the DOD-sponsored very high altitude
“TED
balloon test, Yucca. This test device consisted of a modified Tk.
pressurized and hermatically sealed, and fuzed with a radio command system
backed up with a baro-controlled timer. The radio command system also
supplied signals to actuate the canister deployment,weapon reel out, and
emergency cutdown. Cutdown signals were also supplied by the fuze backup
time and two clock timers.
Radio command and monitoring of the system was accomplished from a
trailer van control station located aboard the USS Boxer. The EG&G timing

system was utilized to initiate the arm and fire sequence.

After five proof-

test flights during Hardtack, the Yucca system was launched on April 28, 1958
at 1125 hr from the flight deck of the USS Boxer at 164°30'E longitude and

11°45'N latitude.

At launch plus 8 min, altitude 7000 ft, the five instrument

canisters were deployed by radio command, and at launch plus 13 min,
12,000 ft, the Yucca device was reel-deployed by radio command. The
balloon-borne system reached a floating altitude of 86,000 ft at launch plus
88 min. Later a delay was requested by TG 7.4. Yucca was detonated by
radio command at H-hour prime, 1440 hr, at 12°37'N latitude and 163°01.5'E

longitude.

TED.

The yield for Yucca, estimated from the history of RMicine, was
given by B. E. Watt, LASL, a
Jyhe only major operational problem
encountered during the test was caused by radio interference with the fuzing
command system. After all unnecessary radio circuits below 300 Mc were

closed down, all interference disappeared.

The objective of Project 34.3 was to procure, assemble, and check out
the devices for the two underwater detonations, Wahoo and Umbrella, sponsored by the DOD.
Procurement of the needed parts included the design and purchase of

the watertight device cases, the underwater signal cables, and the necessary
53