Sebp.

lasveiiss Project Zeport.

arsnsportation fecilities were edecuate with the exception et Ponepe
€ll ecuipment hed to be ligihtered eshore involving & trip of almost one
hour vhich eddec et least tro cays to the unloading of the deteéhmont <nd
its e,uipzent.

Communicetion ves performed vith radio set SOZ-399 end wes excellent

n
3

except for & couple deys when the weether wes exceptionelly bed end reception wes cut out.
» speciel problem was created in thet en edecuate storace trea wes
avelleble where eli suprlies could be stored eni sorted.
necormrendetions for ¢ future project include the following itexs:
Fipe ana necessary supplies to instell e« letrine end showers in
vuiliinz erected durins this .roject. -lso, € double sink unit siio-1li be

instelle? in the kitchen building.

This e-uipment shoulc include £00 feet

of 2-inck pipe to bring the eter froa the weter meine

sn acditionel pre-cut engineer hut should be erected to be uses
aos storeze warehouse. This building should Pive elditionsl rei rforcing

unéer tre floor eni the ox! inch floor Joists srould 2e repleceé with 2x!
inch luster.

errengeneents shouli be sede so thit all test e:uipment could be
hond-cerried to the for-erd eres.
Recomrend thet helf of the balloons be i1/2913 es the -1/tL2

bétlocn wes not ceticned for cey time use and 212 not give th? desired day
time results.

Recommend thet the xerosene refrieerctors be repleceit with electric

refrigeretors encé the cesoline free.ing units on the wealx-irn refrigerators
be renlecec ith electric units.
Recomuenc thet tre following items be deleted fro- the supriy list

for the detechmert returnizg to Ponepe Islend:
ST9c.

Vs.

2g WoL.T AE

t

wrtt

Tn TITY

100
1

2600 702203557
SOS 7ITE32E 51

launching Zeels
Tyrerater

ee
ee

FEL H07 0200 ~5k

Lount

ec

FE lel ltt 32

Lary

ee

Elarket

ef

1

Te

ke

Fuper

ee

359

Seat

e2

L

Véns-

cé
2

1

Select target paragraph3