MATA: WRS
TS

130196

Dear Ur. LeBaron:

fo facilitate planning for military partisipetien and suppert of
ataenis tests, the Gommission wishes te infcrs the Conmittes ef its
eurreat plans for future full-sesie weapons test operations,

30,
Repten(Jawerey 4,1982 - Dawe 95
2

Box

Class heclaiepaeteo
Folder

Collection

0003

DOE ARCHIVES

326 os. ATOMIC ENERGY
COMMISSION
RG

separate end distinet series will be discussed ia this letter,

_

iCATION CANCELLED
U
b

Three

ia
A summary of plans fer IVY wea forvarded te you by our

Letter ef Octeder 28, 1981, tegether with a cepy of

AB 483A. Since that time the Commission staff and ABC

contractor
persomel have sontinued te work with Joint
Task Foree 1323 ané Armed Forees Speeial Beapens Prejeet
toward IVY and have participated in drawing up a wmutvally
acceptable technics] progr. fnree changes in the original:
eencept have developed.

First, we acw plas te evacuate all

personne) from the Atell prier te the thermcnvelear (XI ZB)
shet, since the safety of the firing party if left ashore
fie doubtful. ‘econd, the high-efficiency, high-yield
(400-600 ET) fiselom device (XING shot) ie scheduled te

fellow the MIXE shot, eonditions follewing MINS perai tting.

Third, unavoidable delays to dste in enginesring, fadricating, and proguring ueterials for the Srregente ead ether
techaiecal apparatus heve forced a change
soheduled shot
dete for MIEE from Ostober 1 te Boveader 1, 1652,
BPSuCT

sideration has been gives te coniugting azcther full-scale

-

% eperation (GPSHOT) at the Eevada Proving Ground fellow
SUMULER-SRAPFER. W had tentatively
te ecaduet
ROT im the Fali ef i988, 10 has recently
Dean deternined
%& UPSHOT sannet Be conducted prior te the early §
of
953. A target date for the be
ef the operation is
February 1, 1953, Yaose plans, however, must reneia sudscest
to ehenge in the event ef ynerpected develepacats. Deviees

forrarting during UPSHOT have act deen ecapletely deterntned
at

s tine.

-

nd

,

BEST COPY AVAILABLE -