TABLE 3.1--FIRING SCHEDULE, BIKINI ATOLL Shot Date Location H+4 Hr Survey 12 May 58 Namu (barge) Figure 3.1 Nutmeg 22 May 58 Eninman (barge) Figure 3.2 Sycamore 31 May 58 Namu (barge) Figure 3.3 Maple 11 June 58 Romurikku (barge) Figure 3.4 Aspen 15 June 58 Namu (barge) Figure 3.5 Redwood 28 June 58 Romurikku (barge) Figure 3.6 Hickory 29 June 58 Eninman (barge) Figure 3.7 Fir Cedar 3 July 58 Namu (barge) Figure 3.8 Poplar 12 July 58 Namu (barge) Figure 3.9 Juniper 22 July 58 Eninman (barge) Figure 3.10 their stations. The crater on the west end of Eninman cleared out very slowly in comparison with the Namu area due-to the water currents and circulation {n general. Very little fall-out was experienced on Enyu. Fall-out from the Fir shot was slight, giving a peak intensity of 12 mr/hr. Water samples taken from rain showers after the Maple and Poplar events showed moderate activity, but the rains did not significantly increase the background level at 1 ‘aea eee to ae ie = Enyu. -~ 35 ~ ao fet we he te ee oe

Select target paragraph3