ERIAL REMOVED Y ACT MAT PRIVAC winy BRAVO Copter Missions The f-: prioritys i were completed (B/5) eccarding ‘to the following 1. Servis 2. TG 7.3 mission, 30 TC 7.3 mission, he. r (In Charge), __.---_ and 13.5 to Station 1341 (Abie). 56 _ see Rad-Safo Survey. (In Charge) and (Monitor) ..... Project 13.4 Recovered equipment, eee Project 13.1 to Unele, Station installation Jevee 7-6 to Tare to accomplish Safety and Engineering Survey, , : eeees Program 18, {In Charge) @nd then to Zebra, Recovered film,..Tare. eceee Project 2.5a to Yokes for 15 minutes and Recovered fallout records, Returned by LCM, (In Charge) with 2 men ..eee Project 16,1 - makes 3 to 5 trips to Charlie with monitor with approximately 5-10 minutes at Charlie, and data, esee Project 2.5a to How, Fe 10. ll. 12. 13. | Recovered instruments Recovered fallout records, (HAN) and ecoeoe LO Tare to reactivate Station 50 and rehabilitate, Mission 13. (TU-13) and > (UCRL) Return via Boat . (Project 6.2) ..... To Tare, Damage Survey. Secure RAYDIST Station and Stuart fram J-4 to recover supplies, Return via 1700 boat (Mission 13). and Station 20 drea, eeoe TG 7.1 to Tare (10 minutes), Nan (10 minutes) Inspection Trip, 3 UCRL men and 2 HAN mn ..... To Charlie Station 1200, equipment, ~~ Recovered data and vese UCRL to Fare, Rehabilitate Station 50. The following BRAVO Boat MieSions were completed (B45) according to the following Priority: i. 2, Cancelled - put on copter. ° ° LOM 33 - with DUKY to Nan carrying 3 men from Project 1.6, 3 men fram H&N and 12 men from EG&G, HAN work (decontamination), LOM 37 to lagoon with 3 men from Project 1,6, - 2 - Recovered equipment, Recovered records,