BRAVO Copter Missions
The f-:
prioritys

i

were completed (B/5) eccarding ‘to the following

1.

Servis

2.

TG 7.3 mission,

30

TC 7.3 mission,

he.

r (In Charge), __.---_
and 13.5 to Station 1341 (Abie).

56

_

see Rad-Safo Survey.

(In Charge) and

(Monitor) ..... Project 13.4
Recovered equipment,

eee Project 13.1 to Unele,

Station installation

Jevee 7-6 to Tare to accomplish Safety and Engineering Survey,

,

:

eeees Program 18,

{In Charge) @nd

then to Zebra,

Recovered film,..Tare.

eceee Project 2.5a to Yokes for 15 minutes and

Recovered fallout records,

Returned by LCM,

(In Charge) with 2 men ..eee Project 16,1 - makes 3 to 5 trips to Charlie

with monitor with approximately 5-10 minutes at Charlie,
and data,

esee Project 2.5a to How,

Fe
10.

ll.

12.
13.

|

Recovered instruments

Recovered fallout records,

(HAN) and

ecoeoe LO Tare to reactivate Station 50 and rehabilitate,
Mission 13.

(TU-13) and

>
(UCRL)

Return via Boat
.

(Project 6.2) ..... To Tare,

Damage Survey. Secure RAYDIST Station and Stuart fram J-4 to recover
supplies, Return via 1700 boat (Mission 13).
and Station 20 drea,

eeoe TG 7.1 to Tare (10 minutes), Nan (10 minutes)

Inspection Trip,

3 UCRL men and 2 HAN mn ..... To Charlie Station 1200,
equipment,

~~

Recovered data and

vese UCRL to Fare, Rehabilitate Station 50.

The following BRAVO Boat MieSions were completed (B45) according to the following

Priority:

i.
2,

Cancelled - put on copter.

°

°

LOM 33 - with DUKY to Nan carrying 3 men from Project 1.6, 3 men fram H&N

and 12 men from EG&G,

HAN work (decontamination),

LOM 37 to lagoon with 3 men from Project 1,6,
-

2

-

Recovered equipment,

Recovered records,