Monday - 8 Merch 1954

BATLY DIARY - BIKINI aTOLL

-

J-3/99

¥F

The following missions were accamplished todays

le Station 90 in position at 1600 hours and moored safely, but will continue
mooring work tonorrow for better accuracy,

2.

Cable not finished but HAN mission starts at 0400, Qitarch 1954, and they give
hopes of having it completed by 1200, 9 March 195k,

3.

4.

Able equipment from Station 13)1 is now on Tare,
Station 1200 equipment is also on Tare, successfully completing a
critical equipment evacuation,

5. LST 5§1 beached at Tare at 1800 hours =~ H&N. loading tonight and including

_ trailer and 9 TG 7.1 vehicles (including 2 jeeps, 5 3/4-ton W/C, 1

2 Y2-ton truck and 1 5-ton M52 truck-tractor) with equipment.

6.
To

8,
9
10.

started on 11,2 station activation,

+

NYOO completed work of calibrating airborne radiac ingtmmenta,

(Program 18) Film Data Recovery dispatched on USS RENSSAW DDE 499

with courier,

. houseboats in position at George Beach,
stations is relatively hot.

The path rom beach to

Task Force shifted position from off Nan to off Tare with no disruption of
recovery missions, or preparations,

i. TUs+13 reports progress on all projects.

12,

EG&G pressing Station 70 work and following cable progress.

13.

UCRL reports optomistic progress on Tare tasks for both TU-l2 and TU-14,

Cperetions here definitely have a pre-shot complex instead of recovery. There is no
reason to believe that the schedule cannot be met; Felt running close, Additional persone

nel have greatly helped Servis,

: