PRIVACY ACT MATERIAL REMOVED 0 GEERET DAILY DIARY = BIKINI ATOLL re a ne ee ne ne ee ee J~3/232 F 1. USS BELLE GROVE arrived at 0400 hours and departed at 0900 hours with three loaded LCK’ a, 2. Careful HAN plan executed this afternoon; a11 HEN and project equipment evacuated in 14 hours. 3. Loading of the LST continues. 4. Scran iron and Project 1.4 barge will sail approximately 2100 with Cunningham accompanying. Walsh, Project 1.4, alerted to be prepared to off-load project equipment upon arrival at Elmer. Se ES*G cameras will be shipped on LST. 6. Plan to backload LSD starting 1600 tomorrow. 7, USNS AINSORT? may be ready for departure at 1900 hours tomorrow, a a T7 7.5 and TG 7,1 Bikini personnel will be aboard. P. 9. departed op USS BELLE GROVE for Elmer. Final security and Rad-Safe sweep will be conducted tomorror, 10. Wnless otherwise directed “ooper will depart Bikini tomorrow which will close out the J-3S Section at Bikini. DISTPTRTTION:. AS 1 non Thompson oS , TiS DOCUMENT CONSESTS or_/_Pacey NQ_/_OF \COPIES, SERIES