PRIVACY ACT MATERIAL RE!‘0V'C3
SCHEDULE OF COPTER FISSIONS ~ 16 KAPCH 1954
MISSION

1

2

PROJECT

PEOPLE INVOLVED

DEPART

RETURN

DESTINATION

TU-7

Rome

0626

860957

Rad-Safe Survey of Atoll.

0829

0919

TT to Ken and drop

0831

0923

EOLG
Prog 18

3

EGtG
Prog 18

Take

and drop,

Pick up

;

Pick up
and return to TT.

to George

and take

to YCV and drop.

Pick up
plus 2
wen at YCV. Go to William and drop
the 2 men. Go to Tare ped and drop
» Return to TT with
(Note:
vent frog TT to
William by boat, picked up 2 nen and

went to Tare.)

4

7.3
TU-L

0845

0917

Mail run.

5

7.3

0903

1035

TT to YCV, pick up 1 man, then to Tere
strip and drop 3 men and return TT.

6

2.58

1001

1310

Pick up at Tare Pad.
Take to How (30 sinutes)
Then take to Love (30 minutes)
Then take to Nan (30 minutes)
Take to Tarc Pad end drop.

7

6.4

1252

14,00

Take movies to YAG 39 and YAG 40.

EDLG

1245

1350

‘TT to YCV and drop

8

1.2b

1.2a

TU-6
Prog 18

and 50 lbs.

and drop

=

Pick up

Ge to Dog

(pickup in 15 min).

Then to George, drop List. Return to
Dog, pick up
and go to YCV
and drop. Pick up'
at ICV
e

9

TT to YCV to TT.

1300

U4L8

and return TT.

TT to Boundry Tare.

Pick up
_ then to Tare

Pad and drop
Return to TT and pick up

UCRL

»

Teke to

Nan and drop

Return to TT. 2°
ih OY DOE

b yar a

l

{328

Select target paragraph3