PRIVACY ACT MATERIAL RE!‘0V'C3 SCHEDULE OF COPTER FISSIONS ~ 16 KAPCH 1954 MISSION 1 2 PROJECT PEOPLE INVOLVED DEPART RETURN DESTINATION TU-7 Rome 0626 860957 Rad-Safe Survey of Atoll. 0829 0919 TT to Ken and drop 0831 0923 EOLG Prog 18 3 EGtG Prog 18 Take and drop, Pick up ; Pick up and return to TT. to George and take to YCV and drop. Pick up plus 2 wen at YCV. Go to William and drop the 2 men. Go to Tare ped and drop » Return to TT with (Note: vent frog TT to William by boat, picked up 2 nen and went to Tare.) 4 7.3 TU-L 0845 0917 Mail run. 5 7.3 0903 1035 TT to YCV, pick up 1 man, then to Tere strip and drop 3 men and return TT. 6 2.58 1001 1310 Pick up at Tare Pad. Take to How (30 sinutes) Then take to Love (30 minutes) Then take to Nan (30 minutes) Take to Tarc Pad end drop. 7 6.4 1252 14,00 Take movies to YAG 39 and YAG 40. EDLG 1245 1350 ‘TT to YCV and drop 8 1.2b 1.2a TU-6 Prog 18 and 50 lbs. and drop = Pick up Ge to Dog (pickup in 15 min). Then to George, drop List. Return to Dog, pick up and go to YCV and drop. Pick up' at ICV e 9 TT to YCV to TT. 1300 U4L8 and return TT. TT to Boundry Tare. Pick up _ then to Tare Pad and drop Return to TT and pick up UCRL » Teke to Nan and drop Return to TT. 2° ih OY DOE b yar a l {328