Programing Plan 2-54, "Info for Project Participants", dtd 6 Mar 54

J. Assure that the Serior Project Participants visit to FRED for
1400 briefing on mission day min. three is coordinated wit: JTF SEVEN,
- ke -Assure that Protocol fa informed at all times as to the status

of arrangements made as regards briefing of, or tours for, participants.
1.

Coordinate original planning of schedule with Protocol to obtain

protocol list of personn-1 to be in charge of participants from place to place
and from time to time,

me Assure that Base Dperations, the AOC, and the MATS Terminal
are briefed on advising the TG 7.4 Adjutant upon the arrival of any Project

Participants.

ne Accept full responsibility in assuring that the Senior Controller
in the CIC ia positively and completely briefed, ty means to include mineographed patterns, on actions to be taken by eirorart before Hehour and for

fifteen (15) minutes after H-hour.

VIKING aircraft,
21,

This is particularly required for all

The Director of Materiel will:

a,

Arrange for ell transportation other than air in accordands-Hth

the schedule for participants provided by the Director of Operations.

ob, Make arran,ements with subordinate agencies for clothing to be
provided the Project Participants during their stay.

c.

Inform Protocol by Disposition Form when arrangements have been

mace in accordance with the schedule,

This report mst be available prior to

closing hours on mission day minus four.

d. Assure that transportation is available as arranged and stand by
from mission day minus three until after mission day to rearrange transportation if required due to a change of schedule.
6.

Accapt changes in the schedule only from the Director of Opera~

tious, Protocol, or the Head uarters Co:mand Section.
22,

The Commander of Deputy Commander will:

a. Upon receist of the list of Project Particivents, contact
approprinte asency in JIF SEViN to ascert.in which of the Q cleared peorle
will be sllowed acces: te axclu:ion areas on JMR on e "noed to know" basis.
Yhis invomactian will then oe civen to frotocol and to Director of Nreaxntions.
~cbeduled,

Db.

minus chrez.

Prepare and .ivc 2 olefin, to the Froject Participant: us
his will nornel)y >: approxinetely 14°C hours on mission day
It +411 be siven to both Senior Project trrticizants from