atingunit to insure that this requirement is fulfilled. e» The Camander, Test Aircraft Unit, will provide the Test Services Unit with a fully qualified Radiological Safety Monitor who will accompany, and become a member of each re-entry team, until such time as the radiation level on RONGERIK does not constitute a hazard to personnel. The Commander, Test Aircraft Unit, has knowledge of this requirement and will be contacted directly in further coordination to be effected by the Camender, Test Services Unit. f, As prt of his specific duties, the Rad/Safety monitor will: (1) (2) (3) Insure that no member of the re-entry team is unduly exposed to excessive radiation. Brief the team prior to take-off concerning the radia- tion hazards which they are likely to encounter. Determine the radiation hazard at each location on RONGERIK scheduled for re-entry during a mission, this function to be completed before an individual enters the particular location, (4) 7 Coordinate the issue of film badges, dosimeters, otees.nr ~ to all members of the re-entry party, supervise the use and handling of the equipment and insure its proper post-mission disposition. g. On each re-entry mission, radiation intensities, as indicated by detection instruments, will be recorded and forwarded to the Director of Operations, this headquerters, ATTN: Technical Projects Division, upon return of the team to ENIWETOK, In addition, samples of coral and other contaminated debris, found in the vicinity of working areas at RONGERIK, will be obtained under the direct supervision of the Rad/Safety monitor, who will convey the samples to a representative of Task Group 7.1 upon return of the team to ENIWETOK. The Rad/Safety member of the team also will record on 2 map or sketch the approximate physical location on the island at which cach sample was collected. To assist in recording this important data, there are attached hereto, as Inclosure #1 forty (40) copies of a hand-drawn map of RONGERI(not drawn to scale). Details concerning the foregoing red/safety requirements first should be obtained from Lt Colonel James E, Crosby, Directorate of Operations, this headquarters. h. The Canmander, Test Aircraft Unit, has been requested to provide the Test Services Unit with the following items of equipment to support at least six (6) pers:nnel who willconstitute the re-cntry tean: (1) Fatigue type suits (2) Heavy socks a 6 @5 |

Select target paragraph3