16
al
MISSION DEBRIEFING FORM
A letter, with a sample mission debriefing form attached, was sent
to T6°7.4:0n 10 March,
To provide a common point of departure in our
effort to insure the success of future missions, it was suggested that
TG 7.4 consolidate the good points of all Debriefing Forms and publish
and distribute one Debriefing Form for all units.
"ROMEO" MISSION
On 12 March 1954 a general briefing for the "Romeo" mission was
given to all participating personnel.
As was the case in the briefing
for the first mission, all phases were thoroughly covered, and visual
aids were utilized fully.
es
PEM SHUTTLE SCHEDULE
i
=a
A PEM shuttle schedule for the inter atoll flight was sent to all
elements of Test Services Unit on 13 March 1954.
FICATION OF RULES
&
URES GO
Y
IGHT OPERATION,
R
TRAFFIC SERVICES AND ICAO PROCEDURES
Only two (2) copies of the ICAO Manual are available on this base,
and they are in the Control Tower, A letter was sent to all elements
of this unit on 15 March, requesting that one officer from each element
familiarize himself with the procedures necessary for this arca..
QPERATIONS DUTY NOO
-On mi’ssion days it was found necessary to have an Operations Duty
NCO standby during off duty hours to answer the ficld telephone connecting
Air Operations Center at Hq, TG 7.4 and this headquarters.
<A roster
designating airmen to perform this duty was published on 15 March,
ARWHsie
83
YL0