PRIVAGY ACT MATERIAL REMOVED
building 10 (transiont officers billct).
4 work order was subrittcl 5
March to Task Group to orect six tents for housing the Si-16 personnel
. at the following locctions with a deadline of 11 March:
1,
Mme tent in the officcr tent area cast of building 38,
2.
Three tents in the airren tent arca west of buildings 40, 41
and 42,
3.
Two tents north end cf tent row "G' wost of building 47.7?
started work on the tents on 6 Merch and corploted
then 12 March,
hs a result of trensforring all aircraft frori Bikini to Rniwctok,
a scrious parking problom wes cncountored,
A study of the Novy porking
area resulted in space for the adciticnal SA-16's, and as oll other park‘hat a new arca
ing arcas wore filled, it was decided by
could be graded, rolled and stabilized for the F4U aircraft not needed
operationally,
This requirercnt was lade known to Task Group 7.5 on 4
2 on 7 March,
Horch and was coupleted by
dirrangeients were rade on 10 herch for two sets cf noso wheel tice
down rings to be sot in the dccontaiination pad and deesy area for the
B-36 aircraft,
These aircraft returning from a mission were contaminated
to on extont that prohibitee rofuoling and were teil heavy when cmpty.
Ticdown rings were consilered neccessary to prevent possible darage to on
aireraft as a result cf hich winds while in this li,htcned condition.
Tic@owns were reacy for use cn 23 Merche
93.
om
Moro for:
Chicf of Staff fr Staff Paint Cff, Subj: “lHousins for
Additional Personnel", (ti 6 Merche
—
LO