Fou lPMENT NEEDED TO START PIT SAMPLING IN THE CONTAMINATED AREA
vF YVONNE. ALSO THIS DATE ANOTHER BACKHOE OPERATOR ARRIVED FROM
JeAes EQUIPMENT FOR DUST CONTROL waS TESTED AND ALL TANKS FILLED.
ON 5 FEBRUARY THE HOT LINE FACILITY WAS COMPLETED AND THE
DIGGING OF SCIL PITS WITH THE USE OF ANTI C PROTECTION BEGAN. EIGHT
PITS WERE COMPLETED THIS DATE. THERE HAVE BEEN MINOR DIFFICULTIES
WITH ONE BACKHOE AND WITH ALPHA INSTRUMENTS. THE aRRAY OF SOIL
PIT LOCATIONS waS EXTENDED THIS DATE TO A POINT NEAR CaCTUS CRATER.
THE CLOSE GRID FIDDLER SURVEY GAVE USEFUL RESULTS AND CERTAIN SOIL
PIT LOCATIONS WERE DETERMINED CONSIDERING THIS NEW INFORMATION.
SOIL SAMPLING IS TO BEGIN ON WORTH YVONNE ON 6 FEBRUARY. SHORT
OF ANY UNFORESEEN DIFFICULTIES WE EXPECT THE SOIL PITS ON
YVONNE TO BE DUG BY 9 FESRUARY AND SAMPLED BY 13 FEBRUARY.