oe gin
Be
eenh
‘ab BeoP.eelsve Lober

Rr
‘a
ot ee
ShMeeea Se

§ "te

-AGoo

=f

CIL-N-1955

OFFICE OF THE TEST DIRECTOR
NEVADA TEST SITE
P.O. BOX "oO"
Mercury, Nevada

12 March 195

TEST DIRECTOR'S INFORMATION LETTER NO. 25
Distribution

TEAPOT SCHEDULE
J3C-191
1,

Reference is made to Test Director's Information Letter No. 2h

2.

The following revised schedule is announced for planning purposes,
The dates shown are the ready dates and those shots marked with
an asterisk are Group A, When the weather is acceptable, the Group a

dated 26 February 1955, subject:

"TEAPOT SCHEDULE",

shots will be given priority.

:

The ready dates listed below are based on APPLE.

'

If APPLE is fired

on 1 March, then BEE will be ready 20 March and ESS 22 March, e¥e,
If APPLE is fired on 15 March then BEF will be ready 21 March and ESS
22 March, etc,
,

SHOT

___-

*APPLE

r

SHOT POINT

1h 15 16 March

ha

20 21 22 March

SBEE

f

READY DATES

ESS

22

22

‘E

HADR

23°

2h «425 March

=

¥

|

;

A

L

HA

ET

|
I

Tal

1

2

3 April

5

2

2

2 April

F

8 8 8 April

post

15 15 15 April

«ZUCCHINI

:

5

25 26 27 March

_ WASP" (600' Airdrop)

wa

loa

22 March

iE

-

.

bunt

2

FOR THE TEST DIRECTOR:
eo/ WT Kerwin

HS
!

4

(i?

a .

re
|
g—
&

|

Céaibiieiiniaieiieel Plans & Operations ~

wa

-

{

.

‘

_

ot
pot

Select target paragraph3