b. (1) "Cold" run with mock-up before removal (2) Heavy material removed by flat cars (3) Use of lead pigs (4) Burial ground Liquid waste (1) c. High level (a) Stored in containers (0) Evaporation (c) Seepage ponds (ad) Other Gaseous waste (1) Removal (2) Storage 13 - 8 DO®ARCHIVES

Select target paragraph3