J3~-DDH-E86 . 8 May 1958 kh, PUBLICATIONS: The following documents were published and distributed this date: 13)0-JFE 134)-JFE 1343-JFE 5. Operational Letter BUTTERNUT - - Ready Date and Shot Time 7May58 Operational Letter POPLAR ~ 2 - Prediction of Effects and 6May58 Operational letter YELLO.WOOD - 1 - Prediction of Effects and Operational Planning Factors BiMay5é Operational Planning Factors MISCELLANEOUS: Capt Pieper relieved LCDR Johnson at Zero site at 1630 hours. (EHP) 6. PHOTO BARGE SITE FOR WAHOO: a. CDR Thurman requested that the grid coordinates for the WAHOO photo barge location be changed to Latitude and Longitude. When this was done the. location fell on the reef which made mooring impossible. be. 7. LtCol Sheahan was so notified, worked out. (JHW) A new location suitable to all is being AIRCRAFT: cndr yD Rigkan,TF SEVEN, called to say that (mdr NcAfee (1G 7.3) was not get- ting enough info to plan the P2V's for nose cone recovery and requested we contact projects for more specific data. Col Gattis reports that from the BIKINI standpoint, UCRL's Fleming cannot plan their SYCAMORE and POPLAR participation until they know the KOA and YELLOWWOOD results. Major Monaco reports that from this atoll coordinator has been effected with Cmdr Brown . of 7.3, and between Cmdr Facer (TU-3) amd the Kwajalein P2V Commanders. Afee's‘problems seem to exist within 7.3. Mc- 3 Incls Radex Reading CACTUS - 8 May 1958 wh Radex Reading CACTUS - 6 May 1958 Radex Reading CACTUS - 7 May 1958 DISTRIBUTION: 1 - J-3 (fuck 1 ~ D/A ( 1 = J-3 tated) (BIKINZ) Be ro Q eg | \ - % “i

Select target paragraph3