J3~-DDH-E86
.
8 May 1958
kh, PUBLICATIONS:
The following documents were published and distributed this date:
13)0-JFE
134)-JFE
1343-JFE
5.
Operational Letter BUTTERNUT -
- Ready Date and Shot Time 7May58
Operational Letter POPLAR ~ 2 - Prediction of Effects and
6May58
Operational letter YELLO.WOOD - 1 - Prediction of Effects
and Operational Planning Factors
BiMay5é
Operational Planning Factors
MISCELLANEOUS:
Capt Pieper relieved LCDR Johnson at Zero site at 1630 hours. (EHP)
6.
PHOTO BARGE SITE FOR WAHOO:
a.
CDR Thurman requested that the grid coordinates for the WAHOO photo barge
location be changed to Latitude and Longitude.
When this was done the.
location fell on the reef which made mooring impossible.
be.
7.
LtCol Sheahan was so notified,
worked out. (JHW)
A new location suitable to all is being
AIRCRAFT:
cndr
yD
Rigkan,TF SEVEN, called to say that (mdr NcAfee (1G 7.3) was not get-
ting enough info to plan the P2V's for nose cone recovery and requested we
contact projects for more specific data. Col Gattis reports that from the
BIKINI standpoint, UCRL's Fleming cannot plan their SYCAMORE and POPLAR
participation until they know the KOA and YELLOWWOOD results.
Major Monaco
reports that from this atoll coordinator has been effected with Cmdr Brown
.
of 7.3, and between Cmdr Facer (TU-3) amd the Kwajalein P2V Commanders.
Afee's‘problems seem to exist within 7.3.
Mc-
3 Incls
Radex Reading CACTUS - 8 May 1958
wh
Radex Reading CACTUS - 6 May 1958
Radex Reading CACTUS - 7 May 1958
DISTRIBUTION:
1 - J-3 (fuck
1 ~ D/A (
1 = J-3 tated) (BIKINZ)