——_
57
These criteria. included the types “
of material, handling equipment that must be
used, the types of ventilation equipment,
the type of air cleaning equipment, the amount
of fluid waste oleenup thst would have to be
provided,
The type and size of storage areas
for screp materials and go forth and right
until the plent was actually put into being,
we were Very close to the designs,
Every drawing that went into the
final construction dxvawings of the plant, first
came through this office for approval so that |
during the early phase, before the operating
contractor wae in a position to provide a
health service, we provided it for hin,
We helped him in selecting personnel,
we helped hia in laying out a health prograa
at the plant for the period of operation of
the plant and during the bresk-in period, that
ia during the time when the plant was being
put into service we provided a h2nd, we pro=
vided equipment, we provided know-how for
evaluation of potential hazards,
& that
when the plant finally went on, the operat~
ing personnel were able to function in a way
which was, according to the criteria that we