1, RESROMBIBILITTES.
RAD-SAFE REQULATIONS
480
A, Tne Comander, Joint Task “arce SEVEN, is responeizle for all radiological
safety during Operation HARDTACK, Tha responsibility for ceneral on-site (Eniwstok
and Bikini Atolls) radiological safety cperations has been delegated to the
Commander, Task Group 7.1.
B, The Conmander, ‘ask Unit 5, Task Sroup 7.1, will exercise overall supervision and control for CTO 7.1 cn all radiologic.) sarety natters.
C. Task Unit loncanders are responsible for the radiological safety of meanders
of their task units. in addition, during operations .n contaminated areas, project
and party leaders arc rasponsible for vcdiological safety of the parties and for
conpliance with theoo regulations.
TI,
RADIOLCOICAL SAFETY OPERATIONS,
A.
B.
TU-6 rad-safe sioper. services vill inelade:
1.
Continuing surveys of the ~salologic.l situaticn at EPQ, to include plotting cad briefing feceilitins capable of portraying oast sad current
radiological situations, “:Jorts ani maps will be prepared for
distribution.
2.
Monitcring assig:ance, training, and advice as requested,
3,
Maintenance and issue cl icnitoring instruments and protective clothing
4,
Personncl dosireiry and records service (to include all cf JIF SEVEN).
5S.
Deecutarination Tacilities for personnel, venicles, and equipment.
as recuirced,
,
Exposure Guides and Dosage Gon:rol.
1.
The total permissible expo sres to participating porgonnel are as
folloxs:
a,
Gemma: 3.75 reentens rer concecvtive lweek period, with a raximun of $,0 rcertgens f>. the Coorstion. Personnel whose previcus
rediatton deze nistory iniicatus t.at thels total accumulated dese
to 1 Jamary 1958 te i+ oxcess of ar 2q1al to $(NeL8) roentgenz,
whese Nig tne age on l Jamicey 1958, will under no circuretances
be allowed to ertecd tie 5.9 2 ~iximum for the Cperation.
-
b.
fAlpaa: 10,0°0 oxposurs nite for iny conrecutive Lieweek period
canputed by cultinplyin: ..i2 averact uir coneentratior in the area
of axposure ti d/2/S3 oy the tours of exocoure, Thit is to be used
én a1) cases where versonns? are not using recsiratory protection
in an alpha=¢ontaninatec arca, ‘Intural alpha backgreunc {fa not
included in the 10,000 units,
2.
The tolerance leval for vericla contavination will ba as fallove:
&.
7 ar/or gama plus beta inside and 7 ar/br game only outside.
Jan) Yeo i
seg — (46