ali?

JOHNSTON ATOLL
FasnNo.

01022
USER

SCIENTIFIC

TITLE

Rocket Motor Storage Building
STRUCTURE FACILITY NO.

SANDIA

SCIENTIFIC STATION NO.

980

{

None

BOD GO+45
FOD GO+60

FUNDING

AGENCY

AEC

{$000)

ENGR

PROC

CONST

TOTAL

PRE-GO
Prior Cost
FY-71

4.9

4.2
0.5

20.5

9.1
21.0

TOTAL

4.9

4.7

20.5

30. 1

FURN

PRIOR YEARS
ENGINEERING

Drawings:

Completed.

91-970-Cl

91-980-Al and A2

91~9380-E]

PROCUREMENT Completed, except for miscellaneous perishable materials to
be procured Post-GoO.

FY 71
CONSTRUCTION This building will be a 32 x 50 x 12-ft. high wood frame structure with corrugated cement asbestos roof, and concrete floor. The sides of
the building will be covered with canvas which can be rolled up to eave height.
Three rotary type gravity vents will be mounted onthe roof. A 24x 10 1/2-ft.
high opening, covered with roll up canvas and located at one end of the building,
will provide access into the work area.
The building will bebermedon three sides, with the open side toward the ocean.

Berms on the south and east side of the building have been constructed Pre-GO;

however, the berm on the north side will not be constructed until after the building subgrade is completed. Cost for constructing the berms is included in F&S

No. 02066.

There are no electrical requirements for the building; however, exterior area
lighting will be provided for the area inside of the berms.