JOHNSTON ATOLL
FasnNo.
01022
USER
SCIENTIFIC
TITLE
Rocket Motor Storage Building
STRUCTURE FACILITY NO.
SANDIA
SCIENTIFIC STATION NO.
980
{
None
BOD GO+45
FOD GO+60
FUNDING
AGENCY
AEC
{$000)
ENGR
PROC
CONST
TOTAL
PRE-GO
Prior Cost
FY-71
4.9
4.2
0.5
20.5
9.1
21.0
TOTAL
4.9
4.7
20.5
30. 1
FURN
PRIOR YEARS
ENGINEERING
Drawings:
Completed.
91-970-Cl
91-980-Al and A2
91~9380-E]
PROCUREMENT Completed, except for miscellaneous perishable materials to
be procured Post-GoO.
FY 71
CONSTRUCTION This building will be a 32 x 50 x 12-ft. high wood frame structure with corrugated cement asbestos roof, and concrete floor. The sides of
the building will be covered with canvas which can be rolled up to eave height.
Three rotary type gravity vents will be mounted onthe roof. A 24x 10 1/2-ft.
high opening, covered with roll up canvas and located at one end of the building,
will provide access into the work area.
The building will bebermedon three sides, with the open side toward the ocean.
Berms on the south and east side of the building have been constructed Pre-GO;
however, the berm on the north side will not be constructed until after the building subgrade is completed. Cost for constructing the berms is included in F&S
No. 02066.
There are no electrical requirements for the building; however, exterior area
lighting will be provided for the area inside of the berms.
VOLI
April 1999
1-26