ao,

JOHNSTON ATOLL
F&S NO.

SCIENTIFIC

TITLE

01020

Nike-Hercules Rocket Assembly Building

USER

STRUCTURE FACILITY NO.

TC
FUNDING

($000)

PRE-GO

JTF-8

Subtask A942

SCIENTIFIC STATION NO.

886

AGENCY

-

BOD

None
ENGR

Prior Cost

PROC

23.0

CONST

125.3

FOD GO+60
TOTAL

FURN

111.8

260.1

4.1

4.1

7.0

115.9

264.2

7.0

MILCON
CRO7-64!

POST-GO

Estimate 3/67
TOTAL

23.0

125. 3

PRIOR YEARS
ENGINEERING
Drawings:

Completed.
91-030-W24
91-097-SS1
91-884-Cl

91-886 Al thru A3
91-886-El thru E3
91-886-S1 thru S4

91-886-M1 thru M3
91-386-W1 thru W4

PROCUREMENT

Completed.

CONSTRUCTION

The Rocket Assembly Building is a 40 x 60 x 19-ft. high

prefabricated structure with a lean-to 12 x 60 x 10-ft. high on the west side.
The building has a concrete floor and corrugated asbestos cement siding and
roofing.

The lean-to area contains a stock room, hydraulic shop, and latrine

facilities. Workbenches are provided in the hydraulic shop and shelving is
provided in the stock room.
The main structure is the Assembly and Checkout Area. A 15-ft. high, 5-ton
explosion proof traveling bridge crane has been installed in this area. Two
sliding doors 12 x 15-ft. high at each end of the building provide access to
the area. A screen room 17 x 57 x 12-ft. high has been installed in this area
on the east side.
The screen room provides shielding protection in accordance with H&N Specification No. H&N-PC-37 and as measured within the limits of the available
RFI test equipment. All doors into the screen room are provided with ''No
Entry'' warning lights and panic hardware.

A separate unit provides humidity

control and air conditioning to the screen room.
All electrical outlets and lights in the building and screen room except the
stock room and latrine are explosion proof. Exterior lighting is provided on
all four sides of the building.

Two TC -furnished motor generator sets pro-

vide 400-cycle power to the screen room, the hydraulic shop and the Assembly
and Checkout Area.
1-23
VOL I

April 1969

tere

.
af he

Select target paragraph3