JOHNSTON ATOLL
F &SNO.

01016
USER

Warheading Building

-

TC

SCIENTIFIC

TITLE

-

Subtasks Al01, Al04, A601 and A942

STRUCTURE FACILITY NO.
884

SCIENTIFIC STATION NO.
;

BOD

None

GO+90

FODGO+90
FUNDING
AGENCY

($000)

ITF -8
MILCON

PRE-GO
Prior Cost

CRO7-64

|POST-GO

ENGR

PROC

28.1

Estimate 3/67

TOTAL

28.1

CONST

TOTAL

FURN

224. 1

252.2

4.9

4,9

1.3

229.0

257.1

1.3

PRIOR YEARS
ENGINEERING

Completed.

Drawings:

91-884-Al and Az

91-884-M1 and M2

91 -884-C]
91-884-S] and S2

91~-884-E1 and E2
91-884-W1 thru W4

PROCUREMENT

91-030-W2]

Completed.

CONSTRUCTION The Warheading Building is a concrete block structure 46 x 82
x 19-ft. high with a lightweight concrete roof.
The interior of the building is divided into four areas:
a.

The Subtask Al0l area is a 26 1/2 x 30-ft. screen room with an adjoining
12 x 28-ft. workroom. The workroom is equipped with a 4-ton monorail
which extends through 8 x 17-ft. exterior doors to 12~-ft. outside the building. Access to the screen room is through 8 x 10-ft. double doors opening
into the workroom.

b.

The Subtask Al04 area (approximately 30 x 33-ft.) consists of a screen
room which is accessible through 8 x 10~-ft. double doors in both the
screen room and the building exterior.

c.

The Subtask A601] area is a 16 1/2 x 30-ft. screen room with an adjoining
16 1/2 x 12-ft. unscreened workroom, which is equipped with a 4-ton monorail.

Access to the screen room is through 8 x 10-ft.

into the workroom.

VOLI

1-18

double doors opening