JOHNSTON ATOLL

SCIENTIFIC

F &S NO.
01012

TITLE Rocket Launch Control & Monitoring Bunker - Subtasks A108,
A109, A201, A202, A203, A601, A602, A603, A604, A606, A6l3,
A614, A620, A901, AI05, AI09, AI1L5 and A962

USER

STRUCTURE FACILITY NO.

IJTF~8&
TC
FUNDING
AGENCY

JTF-8
MILCON
CRO 7-64
CRO 7-65

SCIENTIFIC STATION NO.

881

91-3-1 and 91-3-18

($000)

ENGR

PRE-GO
Prior Cost
POST-GO
Est. 5/65
TOTAL

PROC

45.2

CONST

TOTAL

560.0

605.2

aK
45.2

560.0

BOD GO+90
FOD GO+9 0%
FURN

1.0
605.2

1.0

COMPLETED
DESCRIPTION This facility (completed in 1966) comprises two 54x 72 x 13-ft.
high reinforced concrete, air conditioned, dehumidified bunkers separated by
a 28x 72x 13-ft. high common mechanical equipment area. Both bunkers have

raised floors, suspended ceilings, and latrine facilities. The easterly bunker
will be utilized by Subtasks A905 and A909 for rocket launch control. The west-~erly bunker will be used by Subtasks A108, A109, A201, A202, A203, A6dl,
A602, A603, A604, A606, A613, A6l4, A620, AIO1, A915 and A962 for rocket

payload monitoring.

The bunkers are designed to withstand overpressures of

6 psi on the sides and 3 psi on the roof.

A 500 kva, 4160-480Y/277 volt, 3

phase transformer ''Tl" provides power for scientific facilities and a similar
transformer ''T2" provides power for utility purposes. These two transformers
may be tied together on the secondary side, if required, through a normally
open circuit breaker. An additional transformer on the secondary side provides
120/208 volt, 3 phase power where required. Lighting is RF shielded and provides 75-ft. candles at bench level. Transformer 'T2" also provides 45 kva of
480 volt secondary power to Building 868. The existing electrical system provides 200 amps of 28 volt D.C. power; however, the D.C. distribution panel
and circuitry will not be installed until firm criteria for this power is established.

DRAWINGS:

91-881-Al thru A4
91-881-Cl
91-881-Si thru SILO

91-881-M1l thru M11
91-881-El thru E7

JS 91~88i1-~A100 and Al
JS SK 881-~M100
JS 91-881-E100 and wil

* The FOD for the Launch Control Bunker is GO+90, while that for the Monitoring

Bunker is GO+135.

#2Post-GO requirements, not estimated above; will include contractor support,
for installation of TC furnished equipment and scientific cabling.
TNT

OT

1-12
i