UNFUNDED MILCON PROJECTS FISCAL YEAR 1970 All costs shown are preliminary planning estimates, 1) F&S No. 02044 - Air Passenger and Freight Terminal Existing Quonset Huts T-307 and T-308 will be demolished and replaced by two 40 x 100-ft. steel frame buildings located south of Building 287 and east of the Aircraft Parking area. The buildings will be constructed with concrete block walls, built up roofing, and concrete floors. Space within the buildings will be provided for Flight Operations Offices, Security Offices, Warehousing, Waiting Rooms, and Latrine Facilities. A covered 40 x 100-ft. patio will be provided for waiting passengers. The JTF-8 preliminary planning estimate for this facility is $279, 000. 2) F&S No. 02040 - Shoreline Protection Provide erosion protection through construction of bulkheads and revetments on approximately 5440 lineal feet of shoreline at Johnston Atoll. The JTF-8 preliminary planning estimate for this work is $1, 624, 000. M-1 VOLI