UNFUNDED MILCON PROJECTS
FISCAL YEAR 1970

All costs shown are preliminary planning estimates,
1)

F&S No. 02044

- Air Passenger and Freight Terminal

Existing Quonset Huts T-307 and T-308 will be demolished and

replaced by two 40 x 100-ft. steel frame buildings located south of
Building 287 and east of the Aircraft Parking area. The buildings
will be constructed with concrete block walls, built up roofing, and

concrete floors. Space within the buildings will be provided for
Flight Operations Offices, Security Offices, Warehousing, Waiting
Rooms, and Latrine Facilities.

A covered 40 x 100-ft. patio will

be provided for waiting passengers. The JTF-8 preliminary planning estimate for this facility is $279, 000.
2)

F&S No.

02040

-

Shoreline Protection

Provide erosion protection through construction of bulkheads and
revetments on approximately 5440 lineal feet of shoreline at Johnston
Atoll.

The JTF-8 preliminary planning estimate for this work is

$1, 624, 000.