Mix Fill Building

USER

STRUCTURE/FACILITY NO.

DTC

PROJECT SHARP NAIL

BOD

SCIENTIFIC STATION NO.

950

None
FOO

FUNDING
AGENCY

DTC

($000)

ENGR

PROC

CONST

TOTAL

PRE-GO
Prior Cost

19.9

145.7

*165.6

TOTAL

19.9

145.7

165.6

FURN

4

COMPLETED

DESCRIPTION Building 950 is presently unoccupied; however, the DTC modified
and occupied the building during their stay on J. A. in 1965. It is planned to move
the structure to make space for Decon Pad No. 2 (see F&S No. 02069).
The building is a 20 x 40 x 8-ft. high wood framed structure with a concrete slab,
plywood siding, and a plywood roof with composition roofing. The building is

positioned on a 100 x 100-ft. stabilized area which is enclosed by a security fence.
A reefer van is built into the west side of the building.

An air conditioning and breathing air system is installed in the building. Power
is provided by a 60 kw diesel generator with a duplicate unit provided as backup.
Freshwater is pumped into the building from an adjacent 10,000 gallon storage
tank. Saltwater is provided from the island distribution system. Sewage is piped
into a septic tank and chemical wastes drain into a waste tank; both sewage and
chemical effluents are then piped into the ocean. A boiler, feedwater unit, two
sterilizing units and an air compressor for the breathing air system are located
adjacent to the building on an 18 x 25-ft. concrete pad.

DRAWINGS:

91-950-Cl and C2
91-950-Al
91-950-M1 thru M3

91-950-E1, E3 and E4
JS 91-950-E100
JS 91-950-W100

“Includes cost for F&S No. 80004.