Co.

JOHNSTON ATOLL
F &S NO.

04042
USER

COMMUNICATIONS

TITLE

PMRSignal System - Johnston Island
STRUCTURE. FACILITY NO.

PMR

SCIENTIFIC STATION NO.

None

80D

None
Foo

FUNDING

AGENCY
PMR/

MIPR

($000)

ENGR

PROC

CONST

TOTAL

37.8

32.8

72.8

37.8

32.8

72.8

FURN

PRE-GO

Prior Cost

R-65-027O1756&
R-65-02161756
TOTAL

2.2

2.2

"

COMPLETED
DESCRIPTION A combination distributing frame (CDF) was procured and installed on the third floor of the JOC (completed in 1966).

Cable for voice and data

transmission are provided from the CDF to NH Batteries 1 and 2 and to the Frequency Interference Control Center. The PMR submarine cable, both primary
and redundant, is terminated at the CDF.
91-079-W91 thru W93

JS 91-084-W100 and W101

4-29

VOLI
f

DRAWINGS:

April 1969

Select target paragraph3