COMMUNICATIONS

JOHNSTON ATOLL

04035

te

Page 2

ee

-* oeg He

TAPS

me agi

FY 1971

CONSTRUCTION Nine launch pads will be constructed Pre-GO, making a

total of fifteen completed launch pads.
stalled as the pads are completed.

Cabling for these pads will be in-

POST -GO
CONSTRUCTION The remaining fourteen launch pads will be constructed
and the signal cable installed. The estimate for installation of signal cable
is included in F&S Number 01003, under Post-GO.

Drawings:

91-079-W82 thru W86

91-079-W102 thru W112

4-25

VOLI

u

Select target paragraph3