COMMUNICATIONS

JOHNSTON ATOLL
F&S NO.

04020
USER

TITLE

|:EG&G Signal Cable
“STRUCTURE FACILITY NO.

EG&G
FUNDING
FUNDINE

AEC
Financial

Plan

SCIENTIFIC STATION NO.

None

($000)

BoD

None

ENGR

PROC

GO+30

CONST

TOTAL

FOO GO+30
FURN

PRE-GO
Prior Cost

2.8

111.6

1i4.4

FY-69
POST-GO

3.0

37.0

40.0

39.7

39.7

TOTAL

5.8

188.3

194.1

Estimate 5/65

PRIOR YEARS
ENGINEERING
Drawings:

Completed.
91-079-W87 thru W90, W96

PROCUREMENT All signal cable has been procured and is located at Johnston
CONSTRUCTION Signal cable has been installed in the trough system from the
JOC to constructed facilities which require timing and firing services.

FY -69
ENGINEERING

Completed,

Drawing:

91-079-W97

PROCURBMENT Completed.
CONSTRUCTION Preparations are being made for installation of T&F signal
cable in the cable trough system in anticipation of Exercise LAPWING as
follows:

(1)

100 Pair Signal Cable

(1)

75 Pair Signal Cable

(1)

12 Pair Audio Cable

(2)

12 Pair Audio Cable

VOLI

April 1969

FROM
Bldg. 20, Room 430
Bldg. 20, Room 430

TO
Bldg. 16, TB-3
Bidg. 16, TB-3

16, TB-3

Bldg. 93, TB-3.1&

Bldg. 16, TB-3

Bidg. 93, TB-3.1&

Bldg.

TB-3A.1
TB-3A. 1

Fe naethy annals

Island.

Select target paragraph3