ete., JOHNSTON ATOLL SUPPORT F&SNO. TITLE USER JTF STRUCTURE FACILITY NO. 704 and 705 0318X Swimming Pool and Bathhouse BoD SCIENTIFIC STATION NO. None FOD JTF PRE-GO MILCON CONST TOTAL 1.3 293.3 294. 6 1.3 293.3 294, 6 ENGR ($000) FUNDING AGENCY Prior Cost PROC FURN CRO7-66 CRO 10-65| TOTAL COMPLETED DESCRIPTION The Olympic size 50 meter swimming pool (Building 704) has a cast-in-place reinforced concrete floor and reinforced walls of pressure applied concrete. The inside pool dimensions are 164-ft. 2-in. long by 54-ft. wide. Maxi- mum depth is 10 ]/2-ft. There are two 1-meter andone3-meter diving boards. Around the perimeter of the pool there is a 10-ft. wide reinforced concrete promenade. A 6-ft. high chain link fence, with pole mounted lights. encircles the pool promenade. (Completed in 1967.) The bathhouse (Building 705), is 21 x 41 x 9-ft. high with concrete block walls and a concrete floor and roof. The building, located 80-ft. west of the pool, was completed prior to 1963. The original building has been modified and is now utilized to house the mechanical equipment room and locker and latrine facilities. An 8 x 16x 9-ft. high concrete block extension has been constructed on the north side of the building and provides dressing and shower facilities. An 8x 16 x 9-tt. high steel framed lean-to with corrugated asbestos siding has been constructed on the south side of the building and serves as a store room. Both extensions (completed in 1967) utilized existing roof overhangs. A water filtration system is located east of the bathhouse. DRAWINGS: JS JS JS JS 91-705-A100 JS 91-705-E100 and E101] 91-705-C100 and C101 JS SK~705-E100 91-705-S100 thru S105 91-705-S104 91-705-M100, M101 and M103 3-39 BOitiey VOL I “pee