ete.,
JOHNSTON ATOLL

SUPPORT

F&SNO.

TITLE

USER
JTF

STRUCTURE FACILITY NO.
704 and 705

0318X

Swimming Pool and Bathhouse
BoD

SCIENTIFIC STATION NO.
None

FOD

JTF

PRE-GO

MILCON

CONST

TOTAL

1.3

293.3

294. 6

1.3

293.3

294, 6

ENGR

($000)

FUNDING

AGENCY

Prior Cost

PROC

FURN

CRO7-66

CRO 10-65|

TOTAL

COMPLETED

DESCRIPTION The Olympic size 50 meter swimming pool (Building 704) has a
cast-in-place reinforced concrete floor and reinforced walls of pressure applied
concrete.

The inside pool dimensions are 164-ft.

2-in.

long by 54-ft. wide.

Maxi-

mum depth is 10 ]/2-ft. There are two 1-meter andone3-meter diving boards.
Around the perimeter of the pool there is a 10-ft. wide reinforced concrete promenade. A 6-ft. high chain link fence, with pole mounted lights. encircles the
pool promenade. (Completed in 1967.)
The bathhouse (Building 705), is 21 x 41 x 9-ft. high with concrete block walls
and a concrete floor and roof. The building, located 80-ft. west of the pool, was
completed prior to 1963. The original building has been modified and is now
utilized to house the mechanical equipment room and locker and latrine facilities.
An 8 x 16x 9-ft. high concrete block extension has been constructed on the north
side of the building and provides dressing and shower facilities. An 8x 16 x 9-tt.
high steel framed lean-to with corrugated asbestos siding has been constructed
on the south side of the building and serves as a store room. Both extensions
(completed in 1967) utilized existing roof overhangs. A water filtration system is
located east of the bathhouse.

DRAWINGS:

JS
JS
JS
JS

91-705-A100
JS 91-705-E100 and E101]
91-705-C100 and C101
JS SK~705-E100
91-705-S100 thru S105
91-705-S104
91-705-M100, M101 and M103

3-39

BOitiey

VOL I

“pee