JOHNSTON ATOLL

F&SNO.
0304G

USER

SUPPORT

TITLE

Sand Island Power
STRUCTURE/FACILITY NO.

ADC
CGD 14

BoD

None
FoD

FUNDING

($000)

CONST

TOTAL

FY 69

17.2

17.2

TOTAL

17.2

17.2

AGENCY

CGD 14

SCIENTIFIC STATION NO.

None
ENGR

PROC

FURN

PRE-GO

COMPLETED

DESCRIPTION The submarine power cable from Johnston Island has been tapped
to provide power to Sand Island facilities as follows:
a.
b.

Coast Guard Installations
Baker-Nunn Camera (ADC)

c.

Future Expansion

235 kw
70 kw
95 kw

Feeders in underground conduit are run to the Powerhouse, the Signal Building,
the Transmitter Building and the Baker-Nunn Camera Station. A 450 kva substation is located in the Powerhouse and is equipped with switchgear to permit
the cutoff of the Sand Island power demand in the event of a transmission failure
in any leg of the submarine cable loop. The existing generators in the Coast
Guard Powerhouse were placed on standby. (Completed in December 1968.)

DRAWINGS:

VOL I

Bp rel 1909

91-084-E6 and E7

3-24

po