‘qn
JOHNSTON ATOLL

SUPPORT

F&SNO.

TITLE

0302A

Mess Hall

USER

STRUCTURE. FACILITY NO.

JTE
FUNDING
AGENCY

AEC

SCIENTIFIC STATION NO.

519

sop

None

($000)

ENGR

PROC

CONST

FOD
TOTAL

FURN

PRE-GO

Prior Cost
TOTAL

23.2

306.0

329.2

23.2

306.0

329.2

COMPLETED

DESCRIPTION The Mess Hall originally completed prior to 1963, is a 113 x 152
x 10-ft. high wood framed, plywood sided building with a concrete floor and builtup roofing. The existing facility was expanded in 1964 to provide a 1000 man seating capacity. Other facilities located in the building include a kitchen, bakery,
dishwashing room, boiler room, latrine and other associated mesSing areas.

DRAWINGS:

91-519-Cl
91-519-Al thru A8
91-519-S1 thru S4
91-519-Ml1 thru M5
91-519-El1 thru E7
JS SK-519-Al105
JS SK-519-M103
JS SK-519-M115 and M116

3-9

i

JS
JS
JS
JS
JS
JS
JS
JS

91-519-C101
91-519-A101 thru A105
91-519-S100, $103 thru S105
91-519-M100, M107 thru M109
91-510-Ml11ll thru M114
91-519-E100, £104 and E105
91-519-E107 thru E109, Elli
SK-519-E102 and E103

VOLI

Select target paragraph3