for some other reason are being held in abeyance, are also
shown on yellow pages. Applicable comments are included.
Green Pages - Projects for which engineering, procurement
and/or construction have been authorizedand are scheduled

in the present fiscal year.
Pink Pages - Projects currently scheduled for a future fiscal
year or after ''GO'' which cannot be completed as scheduled
to meet the required occupancy date. Administrative determinations are required to resolve the problems associated with
these projects.
4.4

ISLAND SITE PLANS
Appendix A of this volume includes drawings which show the location
and physical arrangement of the major facilities at Johnston Atoll.

VOL I

April 1969

Select target paragraph3