\ serneerTr |
JOHNSTON ATOLL

SUPPORT

F&SNO.

TITLE

02078

Administration and Operations Building

USER

STRUCTURE “FACILITY NO.

TG 8.3

SCIENTIFIC STATION NO.

None

BoD

None
FOD

FUNDING
AGENCY

($000)

ENGR

PROC

POST -GO

AEC

Est. 3/69

TOTAL

CONST

TOTAL

139.0

139.0

139.0

139.0

FURN

POST -GO
ENGINEERING

To be initiated upon approval and availability of funds.

PROCUREMENT

To be initiated upon availability of funds.

CONSTRUCTION

This building will be located south of Warehousing Building

287.

A 40x 120 x 14-ft. high steel frame structure with corrugated asbestos

cement roof and siding will be constructed. The concrete floor will conform
to normal office standards except for a 4000 pound wheel load capacity requirement in the maintenance area. The maintenance shop will be a 30 x 40-ft. area

located at the west end of the building and separated from the rest of the building by a full height partition wall. The west wall of this area will have a 10x
10-ft. sliding door, and also one personnel door with lock and panic hardware.

Three 10 x 10-ft. rooms and six 21/2 x 6 x 3-ft. high workbenches will be

provided.

The remainder of the building will be divided into office spaces and

latrine facilities. All areas, except the maintenance shop will be fully insulated
and will have 10-ft. high suspended ceilings and gypsum board walls. The interior of the building will be illuminated to an intensity of 40-ft. candles.

VOLI

April 1969

2-72

Corer

Select target paragraph3