Page 2

terminal( Hitiding T-307) and adjoins the north taxiway.

The parking area com-

prises appreximately 33,000 square yards of asphaltic concrete pavement.
FY -69
ENGINEERING In progress.
PROCUREMENT In progress.

CONSTRUCTION Approximately 25,000 square yards of parallel taxiway (center
section of south taxiway) with the necessary lighting system will be constructed.
The taxiway will be a 75-ft. wide asphaltic concrete pavement with 50-ft. wide

h W%

tps

stabilized shoulders on each side.

*Prior costs are for construction of south parallel taxiway (east and west

sections).
1962.

The remainder of the taxiway system was constructed prior to

2-47