ScreNTIFIC STATION NO.

sop GO+120

one

pac

FUNDING
AGENCY.

($000)

ITF-8

.

—

PRE-GO

RDT&E

| Prior Cost

4101-61

Est. 7/65

EAO 1106-| POST-GO

MILCON
CRO7-64

SUBTOTAL

AEC

PRE-GO

.

ENGR

PROC

3.4

—

.

1.0

TOTAL

4.4

TOTAL

11.3

. 142.7

21.6

3.4

FY 69

CONST

32.9

21.6
.

4.0

FooGO+1 208.

FURN

__

36. 3

“

36.9

§.0

ae!

41.3

PRIOR YEARS

ENGINEERING Completed. —

Drawings:

91-058-C1

.

91-058-El

PROCUREMENT Completed.

a

91-058-AE1

«

CONSTRUCTION A primaryfeeder systemwas installedin 1966 to serve the

trailer park,

FY¥ 69

ENGINEERING Completeds *.
Drawing:

PROCUREM
CONSTRUC#™ a ee
; furnished technical trailers will each be provided
with 60 amps 6&
268, 60 cycle, 3 phase power.
POST -GO
PROCUREMENT

To be accomplished.

CONSTRUCTION A compacted and fenced area of approximately 36,400 square
feet will be provided adjacent to the east side of the JOC. It will provide secure

parking for the following trailers:

2-43

VOLI

Select target paragraph3