ee

“ok

JOHNSTON ATOLL

Swe:

SUPPORT *

F aS NO.

TITLE

02040

Shoreline Protection

USER

STRUGTURE/FACILITY NO.

SCIENTIFIC STATION NO.

JTF

None

None

'

BoD

j

Foo

FUNDING
AGENCY

($000)

ENGR

PROC

CONST

TOTAL

5,266.0

5,266.0

1,092.0

1,092.0

FURN

JTF -8/
MILCON

MIPR
21-65
27-66

PRE-GO
Prior Cost
FY-69

28-67 &

,

DASA/

TOTAL

6,358.0

‘

6,358.0

PRIOR YEARS
BE ie eye

MIPR
(1968)

ENGINEERING Completed.

Drawings:

Naval Facilities Engineering Command Numbers:
1069359 thru 1069361
1069339 and 1069367

1069494 thru 1069497
1103889 thru 1103907

PROCUREMENT Completed.
CONSTRUCTION Concrete sheet piling was driven along the tips of the East and
West peninsulas on Johnston Island to prevent erosion of the shoreline. A con-

tinuous concrete cap was placed on top of the piling. A 25-ft. wide area behind
the piling was paved with 4-in. thick concrete.

The length of the piling and paving around the tip of the East peninsula is approximately 700-lin, ft.

Precast concrete block rip-rap has been placed along the

galing {rom the end of the piling, 150-ft. along the west side of the
u& 300-ft. along the east side. The length of the piling and pavEHH of the West peninsula is approximately 1,100-lin. ft. Precast

concrete block’'Wp-rap has been placed along the shoreline extending from the

end of the piling, 100-ft. along the east side of the West peninsula and 30-ft.
along the west side.

In addition, concrete revetments, steel sheet piling and/or rip-rap were placed
at the following locations on Johnston Atoll to protect areas subject to undesirable wave action: