JOHNSTON ATOLL
F &S NO.

02013
USER

_SUPPORT

TITLE

Roadwork and Site Grading
STRUCTURE /FACILITY NO.

JTF

SCIENTIFIC STATION NO.

None

Bop

None
FOD

FUNDING
AGENCY

AEC

($000)

ENGR

MILCON
CRO2-65
CRO 2-66

CONST

TOTAL

FURN

PRE-GO
Prior Cost

|STF-8

PROC

63.6

PRE-GO

Prior Cost

417.5

481i}

86.0

86.0

503.5

567.1

CRO4-66
TOTAL

63.6

COMPLETED
DESCRIPTION The basic road system (completed in 1965) consists of a 20-ft.
wide paved roadway which follows the periphery of the island and permits access
to the major facilities.
This road system includes Mitchell Avenue, Arnold
Avenue, Kelly Avenue and Tinker Drive and connects with the ADC road network
Drainage ditches, catch basins, culverts, and flap gates necessary to handle the
island storm water runoff are provided. Sidewalks (completed in 1966) are provided for Arnold Avenue and Mitchell Avenue,

DRAWINGS:

VOLI
April 1969

91-075-Cl thru C36
91-075-C40 and C41

2-16

JS 91-075-C107 thru Cli2
JS-SK-F-094-C 100

Select target paragraph3