SUPPORT

JOHNSTON ATOLL
02006

Page 2

A 100 kw no-break (uninterrupted power supply, UPS) power unit on the first
floor provides 120/208 volt, 60 cycle, 3 phase power for Users that demand
UPS power for their projects.

A second 100 kw no-break power unit (UPS)

operating in parallel with the existing unit will be utilized primarily by the

Subtask A909 Computer Facility.

An Optical Station (refer to F&S Number

01072) and numerous antennas are located on the roof of the JOC.

Equipment handbooks have been prepared that describe in detail the operational capabilities of all utility and equipment systems in the JOC.

DRAWINGS:

91-20-Al thru A27
91-20-Cl and C2
91-20-S1 thru $14

91-20-Ml1 thru M38
91-20-El1 thru E24

91-20-E26 thru E36
91-20-AA1 thru AA5

91-20-Wi thru W10
91-030-W8
91-030-W1l1 thru W19

91-030-W20 and W25
91 SK-01-Sheets 1 thru 5

JS SK-20-A103
JS SK-20-S119
JS SK-20-M116 and M117

JS
JS
JS
JS
JS
JS
JS
JS
JS
JS
JS
JS
JS
JS
JS

SK-20-E107 and E12) thru E126
SK-20-E131 thru E133
SK-20-W105 thru W107
91-20-A100 and AlOl
91-20-A104 thru All?
91-20-5100 thru $110
91-20-S114 and S115
91-20-M100 and M102 thru M104
91-20-E100 and E102 thru E104
91-20-E107 and £108
91-20-E111 thru E113
91-20-E115, E118 and E119
91-20-El22 and E123
91-20-AA100 thru AA103
91-20-W101 thru W119

POST -GO
PROCUREMENT

Additional furniture will be procured.

2-7

VOL I

Select target paragraph3